A Groundwork company - serving North Las Vegas, NV
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Las Vegas, NV

ADU Site Prep & Utilities in Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Las Vegas: What It Covers and What It Costs

ADU Site Prep & Utilities in Las Vegas runs $45,000 – $130,000 and covers everything that has to happen before a detached unit goes vertical: grading and excavation, sewer and water trenching, electrical service, gas and drainage, slab-on-grade pouring, and the Clark County dust-control and inspection sequence that ties it together. Site work on a typical west-valley lot takes about 3 – 6 weeks from first cut to passed utility inspection, weather and inspection scheduling permitting. Call (844) 797-5026 for a free on-site estimate before you commit to a design.

Call (844) 797-5026

How We Run Site Prep, Start to Finish

A second-story addition that matches the existing roofline

Site work is the part of an Home Additions & ADU in Las Vegas project that determines whether the build stays on schedule or bleeds money. Here’s the sequence we follow, and what you’ll decide at each stage.

Stage 1: Site Walk and Utility Locate (Days 1 – 2)

We map where the water line, sewer lateral, gas stub, and electrical meter sit relative to the proposed footprint, then call in the utility locate. This is where you decide setback position and whether you’re tying into an existing panel or running a new meter. If the lot sits in a master-planned subdivision off Blue Diamond or the 215, HOA architectural review is usually the long pole here, not the trenching.

Stage 2: Grading, Demo, and Dust Control (Days 3 – 6)

Out comes turf, pavers, or a patio slab, then the pad gets cut and graded to drain. Clark County’s dust-control permit governs this stage, and watering requirements for grading and demolition are non-negotiable, so we build water truck and soil-sealing time into the schedule. You’ll decide retaining wall placement and whether the finished grade stays flush with the existing patio or steps up.

Stage 3: Trenching and Rough Utility Runs (Days 7 – 14)

Sewer at the correct fall, water, gas, electrical conduit, and low-voltage for internet. Inspections get called at specific points, and the underground rough-in has to pass before anything gets backfilled. Decisions here: panel size, where you want the gas stub for an outdoor kitchen if you’re planning one, and conduit for solar-ready wiring.

Stage 4: Slab and Footings (Days 15 – 25)

Vapor barrier, rebar or mesh, then the pour. In summer, pours start at 5 a.m. to beat 110°F heat and the concrete gets shaded and cured to specifications. You’ll confirm slab thickness and whether it’s a monolithic pour or a stem-wall foundation, and that choice is usually driven by the final unit design.

Stage 5: Final Utility Connections and Site Restoration (Days 26 – 35)

Tie-ins to the main service, gas pressure test, sewer camera inspection, and backfill grading to final. Then pavers or turf go back, or we pour new concrete. Homeowners often pair that restoration with Concrete Driveways & Concrete Work in Las Vegas or Paver Driveways in Las Vegas if the trench cut through an existing driveway.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make on Utility and Site Materials

None of these are cosmetic. Each one changes cost, longevity, or inspection complexity, and you should understand the trade-off before you sign a scope.

  • Panel: existing vs. new subpanel vs. full service upgrade. Tying into an existing panel is cheapest if there’s capacity, but a 100-amp panel feeding a house and a 1,200-square-foot unit usually needs an upgrade. A new subpanel runs less than a full service change and keeps the ADU separately metered, which matters if you plan to rent it.
  • Sewer: trench into the main lateral vs. septic alternative. Most Las Vegas lots tie directly to city sewer. Where a lot sits far from the main, a grinder pump is the fallback, and it adds a mechanical component that has to be maintained.
  • Water and gas pipe material. Copper is the traditional choice and holds up in desert soil; PEX and CSST gas line are faster to run and less expensive. The honest trade-off: PEX costs less up front but you’ll want to know where the manifold is because it doesn’t tolerate UV exposure.
  • Slab reinforcement. Standard mesh is fine for a lightly loaded patio; rebar at 18-inch spacing is what we use under an ADU footprint because expansive desert soils can shift a slab that’s under-reinforced.
  • Electrical fixtures and finish grade at the service point. Outdoor-rated fittings are worth the extra cost. When the unit includes a bathroom, American Standard and Toto fixtures are common choices because parts support locally is straightforward.

What ADU Site Prep & Utilities Costs in Las Vegas, NV

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for site prep and utility rough-in on a detached Las Vegas ADU. That’s the pre-construction number, not the finished unit; total ADU construction lands between $90,000 and $220,000 once the structure, finishes, and design are in. A written line-item estimate shows what’s included and what isn’t, so nothing gets discovered mid-trench.

What pushes a job to the low end ($45,000 – $65,000): a flat lot with existing grade, short runs to the sewer and water main, an existing panel with available capacity, and no HOA architectural review fighting you on setbacks.

What pushes a job to the high end ($100,000 – $130,000): long utility runs or a grinder pump, a full electrical service upgrade, a retaining wall on a sloped lot, relocation of an existing gas line or pool equipment, and any grading that triggers more than a standard dust-control permit.

What’s in a written estimate: grading, excavation, trenching, pipe and conduit material, utility connections, slab forming and pour, and inspection coordination. Typically separate: the ADU structure itself, landscape restoration beyond grading, and HOA fees.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Las Vegas Lots and Rules Do to This Job

Las Vegas is a hyper-growth Sun Belt metro built almost entirely after 1950 on engineered desert, so site prep here is less about renovating old buildings than about cutting into stucco-and-tile tract subdivisions and master-planned communities on expansive desert soil under extreme heat. The utility runs, drainage grade, and inspection sequence on a northwest valley lot off the 215 are nothing like a wetter climate or even Henderson. Summer monsoons can dump enough water to test a poorly graded pad, so swales and final grade get real attention. We work a lot in and around the 89129 and 89149 corridor, and those 1980s – 2000s subdivisions have the shallow utilities and mature landscaping that make a locate call critical. Every job in Las Vegas also runs through Southern Nevada Water Authority turf limits and Nevada’s Colorado River-driven rules on decorative grass, which affects how the disturbed landscape gets restored. Dust-control compliance on grading and demo is a Clark County item out-of-state contractors routinely miss and then pay for.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Las Vegas

A remodeled primary bathroom with a soaking tub and walk-in shower

Get a Site Prep Estimate That Fits Your Lot

Site work is the part of an ADU that’s hardest to change after the concrete cures, so the walk-through matters. Call (844) 797-5026 to schedule a free on-site estimate in Las Vegas. A live person answers 24/7, we walk the lot, answer your utility and grading questions, and hand you a written line-item quote with no surprises. Estimate is free; the number you see is the number you pay.

Written by the team at Groundwork Construction Co.

Why Las Vegas Chooses Groundwork Construction Co. of North Las Vegas

We set the standard for ADU site prep & utilities in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pit

More services in Las Vegas

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(844) 797-5026

Request a Free Estimate in Las Vegas

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch