







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterFull Bathroom Remodeling in North Las Vegas, NV
Full bathroom remodeling in North Las Vegas typically runs $14,000 to $38,000 for a standard hall or guest bath, and $28,000 to $65,000 for a primary suite with a curbless shower, freestanding tub, and double vanity. A full remodel means a complete teardown to the studs: new plumbing rough-in, new electrical, new waterproofing, new tile, new fixtures, and new ventilation. Nothing gets left behind to fail in year three.
We take on full bathrooms because that’s where cheap work shows up fastest. A North Las Vegas bathroom fights a dry desert climate in winter, 118-degree summer attic heat, and some of the hardest water in the valley. That water is the reason we tear out old supply lines and pressure-test before closing walls, rather than tiling over plumbing that already carries six years of scale.
Every project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. No one has to chase us to honor it. Call (844) 797-5026 and a live person picks up, day or night, to set up your free estimate and design consult.
This page covers the full-scope teardown. For a wider look at everything we do in bathrooms, see our Bathroom Remodeling service, and for the North Las Vegas picture specifically, Bathroom Remodeling in North Las Vegas.
Key Takeaways
- A full remodel goes to the studs: plumbing, electrical, waterproofing, tile, fixtures, and ventilation all get replaced.
- Plan on $14,000 – $38,000 for a standard bath, $28,000 – $65,000 for a primary suite in North Las Vegas.
- Our technicians have up to 12 years of experience, and every project is covered by the 730-Day Done Right Promise.
- Calls are answered by a live person 24/7, and 0% financing for 18 months plus $1,000 off projects over $10,000 help keep a whole-bath rebuild inside your budget.

When You Need Full Bathroom Remodeling
- Water is showing up where it shouldn’t. Soft, dark drywall at the base of a shower wall means the pan has been leaking for a while. In North Las Vegas homes built through the 1990s, the original pans are often set right on a concrete slab with thin liners that fail quietly. When the drywall is soft and the baseboard is swollen, it’s not a fix, it’s a rebuild.
- The layout fights how you actually live. A 45-square-foot hall bath with a tub you haven’t used in a decade, a door that swings into the vanity, and a shower too narrow to turn around in. A full remodel reshuffles the room so the shower is where the room allows it and the storage works.
- The original build is 20-plus years old and untouched. In the tract neighborhoods around Aliante and the older blocks near Civic Center Drive, we regularly see bathrooms that still have the builder’s vanity, single-hung window, and a plastic exhaust fan ducted to nowhere. Those fans pull moisture into the attic instead of outside, and in a dry climate that trapped humidity is exactly what rots framing behind the shower.
- Hard water has taken the fixtures. North Las Vegas water is heavy with calcium. Showerheads, cartridge valves, and toilet fill valves all wear out faster here than they do in soft-water regions. When your fixtures are scaling shut and the tile grout is etched gray, a remodel is cheaper than a rolling repair habit.
- You’re aging in place or preparing for resale. A curbless shower with a bench, a comfort-height toilet, and grab bar blocking hidden in the walls takes planning. That blocking has to go in during the remodel. Putting it in later means tearing out the tile again.
- Accessibility changes the whole plan. Whether someone in the home uses a walker or a wheelchair, a full remodel is the only reliable way to get a usable roll-in entry, a five-foot turning radius, and the right grab bar placement.
Our Full Bathroom Remodeling Process
Every full bathroom we build in North Las Vegas follows the same sequence. It’s the order that protects your walls, your schedule, and your budget.
- Free estimate and design consult. We walk the room with you, look at what’s behind the fixtures, and take real measurements. Upfront pricing, no surprises: you get a written number before anyone swings a hammer. This is where we set the layout, tile direction, fixture grade, and ventilation plan.
- Demo and inspection. The room comes down to the studs, old plumbing and wiring go, and we look at the framing and subfloor underneath. If a surprise shows up (rotten sill plate, a slab crack, an unvented dryer), we show you and price it before we go further. No change orders slipped in at the end.
- Rough-in and inspections. New supply and drain lines, new electrical with GFCI protection, a properly sized and vented exhaust fan, and shower valve rough-in. All of it gets inspected before it’s buried. The water in North Las Vegas earns extra care here, so we pressure-test the new lines first.
- Waterproofing and tile. This is the part that decides whether a bathroom lasts. We use a bonded waterproofing membrane over cement board, slope the shower pan to the drain, and set tile with movement joints at the corners. A homeowner will never see this stage again, which is exactly why it gets done right.
- Set and finish. Cabinets, vanity top, fixtures, toilet, glass, trim, and paint. We run the shower, the tub, and every drain before we call it done. A final walkthrough with you confirms the punch list is cleared.
- Back it in writing. When we hand over the keys, the 730-Day Done Right Promise starts. If a grout line cracks or a valve drips, we come back and fix it. That’s the whole basis of the offer.
One contractor handles all of it: tile, plumbing, electrical, drywall, paint, and glass. You’re not coordinating a parade of sub-trades and hoping they show up. We also arrive in uniform, are background-checked, and call ahead. That’s not a marketing line, it’s how we’re insured to work.

Full Bathroom Remodeling Pricing in North Las Vegas
Full bathroom remodeling in North Las Vegas costs $14,000 to $38,000 for a typical hall or guest bath and $28,000 to $65,000 for a primary suite, depending on size, layout changes, and finish level. Those are real working ranges for a complete teardown, not a patched-over refresh. Here’s roughly where the money goes on an average project.
| Line item | Typical range | What drives the number |
|---|---|---|
| Demo and haul-away | $1,200 – $3,000 | Tub removal, tile removal, disposal, slab cleanup |
| Plumbing rough-in and new supply/drain | $2,000 – $6,500 | Moving the toilet or shower, new lines, re-pipe in older homes |
| Electrical and lighting | $1,000 – $3,200 | New circuits, GFCI, recessed lights, exhaust fan and venting |
| Waterproofing and tile | $3,500 – $11,000 | Square footage, tile grade, shower design, niche and bench |
| Vanity, cabinets, countertop | $2,000 – $8,000 | Stock vs. semi-custom, top-grade quartz, double vanity |
| Fixtures and hardware | $1,500 – $6,000 | Faucets, shower valve, toilet, tub, glass enclosure |
| Drywall, paint, trim | $1,500 – $4,000 | Repairs after demo, full repaint, trim and door work |
What pushes a North Las Vegas bathroom toward the top of that range: layout changes that move plumbing, a slab foundation where moving the drain means cutting and patching concrete, and older homes that need a re-pipe while the walls are open. What pulls it back: keeping the shower and toilet where they are, choosing a semi-custom vanity instead of a full custom build, and a standard footprint. We sit down with those numbers in front of you, and we use the brands we trust. We install Therma-Tru exterior doors, and we spec Kohler fixtures because they hold up better against North Las Vegas water. Quality over availability, every time.
We pair upfront pricing with 0% financing for 18 months and $1,000 off projects over $10,000. Spread across a larger remodel, those two offers together usually shorten the payback on the job. Your free estimate and design consult comes with the written number before you commit to anything.
Bathrooms we’re doing in North Las Vegas: the projects are across the valley, but the questions are the same. A North Las Vegas bathroom fight is the same fight across the valley, and we know the neighborhoods: the newer builds in Aliante and Tule Springs, the mid-century houses around Downtown, and the established blocks in the El Dorado and Craig Ranch area. We see the same vent and shower-pan failures in those areas often. If your bathroom is on the 20-year list, call (844) 797-5026.
What Makes a Full Remodel Different From a Refresh?
A full remodel replaces everything behind and in front of the walls, while a refresh replaces finishes over the existing plumbing and layout. If the fixtures are sound and the room is dated, a refresh is cheaper. If you’re doing to the studs regardless, a refresh shows you the same price gap in the end.
Here’s where it matters most. A full remodel gets new supply lines, a new drain, and new waterproofing. Those three things are what fail first in a 20-year-old bathroom, and none of them can be fixed from the surface. For a look at the lighter version of this work, see our Bathroom Remodeling page. Same team and same promise, different scope.
Why Choose Groundwork Construction Co. of North Las Vegas
We’ve been in business since 2014 and serve communities across the valley, and full bathrooms are one of our seven core service lines. The 730-Day Done Right Promise is one of the longest workmanship guarantees in the residential construction space. If it’s not done right, we make it right, and it holds for two years after we hand over the keys.
Our technicians have up to 12 years of experience. They’re background-checked, they arrive in uniform, and they show up when they say they will. We’ve been in this business long enough to know that’s a low bar, and most crews still trip over it.
Calls are answered by a live person 24/7. No voicemail, no waiting until Monday. That’s the reason to call.
FAQs – Full Bathroom Remodeling
How much does a full bathroom remodel cost in North Las Vegas?
A full bathroom remodel in North Las Vegas runs $14,000 to $38,000 for a standard hall or guest bath and $28,000 to $65,000 for a primary suite with upgraded finishes, a curbless shower, and a double vanity. The biggest cost drivers are layout changes that move plumbing, slab-cutting for drain relocation, and finish grade. Call (844) 797-5026 for an exact quote. Estimates are free, and the number we give you is the number you pay.
How long does a full bathroom remodel take?
A full bathroom takes most North Las Vegas homeowners about three to five weeks from demo to final walkthrough, and larger primary suites run five to seven weeks. The schedule hinges on two things: how long the permit and inspection process takes, and whether we find rot or an unvented fan once the walls are open. We give you a written schedule with the pricing before demolition starts, and we call the same day if a surprise changes it.
Is it cheaper to repair or replace a bathroom?
Repair is cheaper when the problem is a single failed faucet or a cracked tile, and a full replacement is cheaper when the waterproofing, plumbing, or layout is past saving. In North Las Vegas, we see a lot of bathrooms where the shower pan has been leaking behind the tile for years. Patching the surface just moves the repair bill down the road. We tell you which side of that line your bathroom is on during the free estimate, no pressure attached.
Do you do the work yourselves or subcontract the trades?
We’re the single contractor on the job, and we manage every trade from demo through final walkthrough: plumbing, electrical, tile, drywall, paint, and glass. You get one point of contact and one written price. We’re licensed and insured, our technicians are background-checked and uniformed, and every project is covered by the 730-Day Done Right Promise.
Book Your Free Estimate
If your North Las Vegas bathroom is due for the full teardown, call (844) 797-5026 for a free project estimate and design consult. You’ll get a written scope, an upfront number, the 0% financing for 18 months and the $1,000 off projects over $10,000 explained in plain terms, and a crew that answers the phone. Let’s give that bathroom the rebuild it needs, from foundation to finish line.
Written by the team at Groundwork Construction Co. of North Las Vegas, serving North Las Vegas.


