ADU Site Prep & Utilities in Paradise, NV: What It Involves and What It Costs
ADU site prep and utilities in Paradise typically runs $45,000 – $130,000 for the ground work, connections, and site systems that sit under the finished unit, and the prep phase usually takes 3 – 6 weeks before a single wall goes up. That figure covers grading, drainage, trenching, the utility stubs, and slab or foundation work, not the building itself. If you’re pricing a backyard unit, call (844) 797-5026 and we’ll walk your lot and give you a written line-item number.
How the prep and utility work actually runs, stage by stage

This is the part most homeowners underestimate. The structure goes up fast; the ground under it is where the schedule lives or dies. Here’s the real sequence.
Stage 1: Site walk and utility locate (day 1 – 2)
We mark the build pad, find the existing sewer, water, gas, and electrical runs, and call for locates so we don’t cut through something expensive. You decide the unit’s footprint and orientation on this visit, because where the pad sits determines how far every trench has to travel. Most pad placements add or subtract $5,000 – $15,000 in trenching alone.
Stage 2: Grading and drainage (day 3 – 7)
Paradise lots drain toward the street on the older tracts, and monsoon rain moves fast across bare Mojave soil. We cut and compact the pad, set the slope away from both the ADU and the main house, and install a drainage path so a flash storm doesn’t undercut the slab. You choose whether that’s a simple graded swale or a buried drain tied to the street; the buried option costs more but keeps the yard usable.
Stage 3: Trenching and utility stubs (day 5 – 12)
Water, sewer, electrical, and gas each get their own trench at the right depth, with sweeps and cleanouts placed for future access. This is where relocating an existing line becomes the big variable. If the sewer lateral has to leave its current path, or the panel has to move to carry a second meter, expect both the labor and the inspection count to rise. You decide at this stage whether the ADU gets its own meter or ties into the main service.
Stage 4: Foundation and slab (day 12 – 25)
Forms, rebar, and a vapor barrier go down, then the pour. In Paradise we pour early morning during the hot months because concrete curing in desert sun is unforgiving, and a slab that dries too fast cracks before it’s even loaded. You’ll walk the finished slab with us before the framing crew arrives.
Stage 5: Rough-in inspection and handoff (day 25 – 35)
The county inspects the underground plumbing, electrical, and the slab before anything covers it. Once that passes, the prep phase closes out and the build begins. Everything here is covered by our 730-Day Done Right Promise, and we schedule the inspection for you rather than leaving it in your lap.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that shape a Paradise ADU site
- Own meter or shared service: A separate electrical meter costs more up front but makes the unit rentable or billable on its own. Sharing the main service is cheaper and simpler, but you’re managing one bill across two structures.
- Drainage: graded swale vs. buried line: A swale is the low-cost option and handles most storms. A buried drain tied to the street holds up better in a heavy monsoon and keeps the yard clear, at a higher install cost.
- Slab vs. raised foundation: A slab is the standard and the cheaper route on flat Paradise lots. A raised foundation costs more but makes future plumbing access easier and handles a lot with grade challenges.
- Utility trench depth and material: Standard PVC and schedule-rated conduit are the baseline; upgrading to heavier conduit and deeper runs costs more but buys you slack if you ever add a second unit or expand service.
- Fixtures and finish at the connection points: Where the unit touches water and power, brand and grade matter. We work with names like American Standard and Schluter on the wet-side components; the honest trade-off is that a budget fixture saves now and costs more to swap later.
What ADU Site Prep & Utilities costs in Paradise, NV

Expect $45,000 – $130,000 for the site prep and utility work on a Paradise ADU, with most single-unit backyard projects landing in the middle of that band. The low end fits a flat, well-drained lot where existing utilities are close and the pad doesn’t need much cut or fill. The high end means long trench runs, a sewer or panel relocation, significant grading, or a lot that needs engineered drainage.
What pushes the number up:
- Distance from existing utilities: every extra foot of trench adds labor and material, and sewer runs are the costliest.
- Grade and drainage: a lot that slopes toward the house needs more earthwork and a real drainage plan.
- Relocating plumbing, electrical, or a structural line: moving a lateral or the main panel is the single biggest swing on the estimate.
- Material grade: heavier conduit, higher-grade drain line, and upgraded connection fixtures each add to the total.
- Permit and inspection scope: more trades on the underground work means more inspections, and that time is real cost.
A written estimate from us lists every line: grading, trenching, materials, inspection fees, and the slab. What it typically doesn’t include is the ADU structure itself, interior finishes, or landscaping after the work. Call (844) 797-5026 for an exact quote, and estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Paradise homes specifically do to this job
Paradise is one of the few unincorporated urban communities in the valley, which means every ADU project here is permitted through Clark County, not a city building department. That single county counter also serves the entire Las Vegas Valley, so review timelines and inspection scheduling run on the county’s system, and out-of-town builders who assume they’re pulling a City of Las Vegas permit get stuck. We plan for that county queue up front so the underground inspection doesn’t stall the pour.
The housing stock adds its own wrinkle. Paradise spans mid-century tract homes from the 1950s through the 1970s alongside dense apartment and condo complexes, and those older lots often have shallow or undocumented utility runs. We locate before we trench, because hitting an unmarked line on a 1960s lot is the fastest way to blow a budget. The desert climate shapes the rest: extreme sun and heat dictate an early-morning concrete pour, and flash-flood risk from monsoon storms makes drainage non-negotiable rather than optional. We handle ADU site prep and utilities across Paradise, and homeowners often pair the driveway and pad work with Concrete Driveways & Concrete Work in Paradise.
Serving Paradise, NV – Our Local Coverage Area
We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: ADU Site Prep & Utilities in Paradise

Plan on 3 to 6 weeks from the first site walk to the passing underground inspection. Flat lots with nearby utilities finish near three weeks; lots needing grading, engineered drainage, or a line relocation push toward six. Call (844) 797-5026 to get a timeline for your specific property.
Yes. Because Paradise is unincorporated, the work is permitted and inspected through Clark County, not a city building department. We pull the permits and schedule the inspections. Call (844) 797-5026 to schedule a free estimate.
In most cases, yes. If the ADU footprint can sit near the existing service and the sewer lateral stays put, you avoid the biggest cost driver. When a relocation is forced by grade or lot layout, that’s where the estimate swings. Call (844) 797-5026 and we’ll tell you which side of that line your lot falls on.
The range is $45,000 – $130,000 for the site prep and utility work, and we hold the written line-item number through the project. If a hidden condition surfaces underground, we stop and quote it in writing before doing the extra work. Call (844) 797-5026 for an exact quote.
Every project is backed by our 730-Day Done Right Promise: if the work isn’t done right, we make it right. That covers the ground work and connections we install. Call (844) 797-5026 with any warranty question.
Get a free on-site estimate for your Paradise ADU site prep
We’ll walk your Paradise lot, mark the build pad, locate the existing utilities, and hand you a written line-item estimate for the site prep and utility work. This is part of a full Home Additions & ADU in Paradise project, and you can see our wider Home Additions & ADU scope if you’re still weighing options, or pair the pad with Paver Driveways in Paradise later. Call (844) 797-5026 for a free estimate.