







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Henderson, NV: What the Job Really Involves
Cabinets & countertops in Henderson typically run $14,000 – $45,000 for a full kitchen’s worth of both, and most jobs are finished in three to five working days once materials land on site. The work means tearing out the old boxes and tops, correcting the walls and plumbing rough-in, setting new cabinet runs level and square, templating the countertop, then installing it and the sink and faucet. Call (844) 797-5026 and we’ll walk your kitchen and put real numbers in front of you.
How We Run a Cabinet and Countertop Job, Start to Finish

This is a sequencing job. Get the order wrong and you’re paying twice for the same wall. Here’s the five-stage sequence we follow on Henderson kitchens, with what you decide at each point.
Stage 1: Measure, Layout and Order (day one, about 2 hours on site)
We measure every wall, check for out-of-square corners and note where the plumbing and electrical actually sit versus where the new layout wants them. You decide box style, door style, finish and the appliance sizes you’re committed to. Cabinet lead times drive the whole calendar, so this conversation happens before anything gets ordered. Most stock and semi-custom lines land in two to four weeks; full custom runs longer.
Stage 2: Demo and Prep (one to two days)
Old cabinets and tops come out, and we open the wall where needed to move a receptacle, a supply line or a drain. Drywall gets patched, the floor gets protected, and any damaged subfloor or wall studs get corrected. You decide here whether you’re keeping the existing sink and faucet or replacing them. Reusing a 15-year-old faucet on new stone is a decision people regret, and we’ll say so.
Stage 3: Cabinet Set (one to two days)
Base and wall cabinets go in level, shimmed and screwed into studs, with filler strips and crown fitted. Drawers and doors get adjusted so reveals line up. This is the stage where a wall that’s an inch out of plumb shows up, and it’s why we check square on day one rather than discovering it on day three.
Stage 4: Template and Countertop Fabrication (three to seven days of shop time)
For stone and quartz, a fabricator templates the actual installed cabinets, then cuts and polishes in the shop. You decide edge profile, sink cutout type (undermount versus drop-in) and whether you want a waterfall end. You’re without a working sink for a few days here, so plan accordingly.
Stage 5: Countertop Set, Sink and Final Walkthrough (one day)
Tops get set, seams aligned, sink and faucet connected, and silicone cleaned up. Laminate or butcher block can skip much of stage 4 and go in the same week. We walk the finished kitchen with you, adjust anything that needs it, and hand over the workmanship paperwork.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
- Stock versus semi-custom cabinets. Stock boxes are the fastest and cheapest route and work well in standard tract layouts. Semi-custom buys you odd widths, taller uppers and interior fittings. Custom is worth it when the room is genuinely irregular.
- Quartz versus granite versus laminate. Quartz is the default for good reason: non-porous, no sealing, consistent slabs. Granite costs similar money, brings natural movement, and needs periodic sealing. Laminate remains the budget answer and has gotten genuinely good-looking, but it will not survive a hot pan.
- Box construction and drawer hardware. Plywood boxes outlast particleboard in a kitchen that sees daily use. Soft-close hinges and full-extension drawer slides are a modest upcharge and the single most-noticed upgrade in the room.
- Sink and faucet pairing. A deep single-bowl undermount suits most cooks. Farmhouse sinks require a cabinet designed for them, so decide before ordering, not after.
- Edge profiles and backsplash height. A simple eased edge keeps cost down and looks clean. Full-height backsplash adds cost but is easier to wipe than painted drywall above a hot stove.
What Cabinets & Countertops Costs in Henderson, NV

Plan on $14,000 – $45,000 for cabinets and countertops together in a typical Henderson kitchen. Broken down, cabinet installation alone runs $4,000 – $13,000, countertop installation $2,000 – $6,500, and a kitchen island adds $3,000 – $10,000 if you’re adding one. A backsplash runs $800 – $2,500 if you include it. A smaller galley or condo kitchen can land under $20,000 for the pair.
What pushes a job toward the high end:
- Room size and cabinet run length. Linear feet of cabinetry is the biggest single driver.
- Existing condition. Out-of-square walls, water damage under the sink, or a floor that needs leveling all add prep days.
- Moving plumbing or electrical. Relocating a sink, range or dishwasher circuit adds trades and inspection time.
- Material grade. A quartz slab with a dramatic pattern costs more than a plain one; semi-custom cabinetry costs more than stock.
- Permit scope. A straight swap may not need one; moving plumbing or walls will.
Our written estimate is line-item, and the number you see is the number you pay. It lists what’s included: demo, haul-away, cabinet set, countertop fabrication and install, sink and faucet connection, and cleanup. It does not include appliance purchase, major electrical panel work or structural changes, which we’d quote separately.
See the difference
Before
After
Before
After
Before
AfterWhat Henderson Homes Specifically Do to This Job
Henderson is a master-planned, still-growing bedroom city of Las Vegas built almost entirely in the last 30 years, so we’re rarely ripping out 1970s cabinets. What we see is original 1990s-to-2000s tract-home cabinetry in Green Valley and Anthem that’s structurally fine but finished in a honey oak that nobody wants anymore, plus a first round of builder-grade laminate tops that have finally chipped and delaminated. In Seven Hills and Lake Las Vegas, the kitchens are larger and the owners tend to go semi-custom with quartz. Underneath all of it sits high-desert caliche and expansive clay, and any slab or wall change tied to a kitchen layout has to respect the permitting that soil demands. The practical note: this is HOA-governed housing, so exterior vent changes or anything visible from the street needs HOA sign-off before we order. If the kitchen work is part of a full Kitchen Remodeling in Henderson plan, the sequence shifts, and we’ll tell you where. Owners expanding their footprint often pair this with a Garage Conversion ADU in Henderson, which reuses the same cabinet and countertop suppliers.
Serving Henderson, NV – Our Local Coverage Area
We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Henderson

Three to five working days on site, with two to four weeks of cabinet lead time before that. Stone countertop fabrication adds three to seven days in the middle of the job. Call (844) 797-5026 for a schedule based on your actual kitchen.
Often not, if you’re swapping cabinets and tops in the same footprint. A permit is typically required once you move plumbing, electrical circuits or walls. We tell you which category your job falls into during the estimate, and we pull permits when they’re required.
Yes, and it saves real money. Keeping the sink, range and dishwasher where they are avoids plumbing and electrical rough-in, which is a meaningful chunk of the $14,000 – $45,000 range. Call (844) 797-5026 and we’ll tell you what your existing layout allows.
Cabinet installation alone is $4,000 – $13,000, and countertop installation alone is $2,000 – $6,500 in Henderson. Doing them together is usually the better value because demo and prep happen once. Call for a written line-item quote either way.
Every cabinets and countertops project we run is covered by our 730-Day Done Right Promise. If it isn’t done right, we make it right, for two full years after the walkthrough. Call (844) 797-5026 to schedule your free estimate.
Get a Free Cabinets & Countertops Estimate in Henderson
If your Henderson kitchen is due for new cabinets and countertops, start with a free on-site estimate. Call (844) 797-5026, a live person answers around the clock, and we’ll walk your kitchen, measure the walls, and hand you a written line-item quote with no surprises. If you’re also touching the wider room, the kitchen remodeling scope and a New Detached ADU in Henderson are both things we handle. We cover all of Henderson, including 89002, 89052, 89009 and 89016.
Written by the team at Groundwork Construction Co.












