A Groundwork company - serving North Las Vegas, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Enterprise, NV

Garage Conversion ADU in Enterprise - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Enterprise: What It Takes and What It Costs

A garage conversion ADU in Enterprise typically runs $45,000 – $130,000 and takes 10 to 16 weeks from first inspection to final walkthrough. The work turns an attached garage into a legal, permitted living unit: new slab or floor build-up, framing and insulation, a bathroom and kitchenette, separate electrical, and a finished exterior skin. Most 89139 garages yield a 400 – 550 sq ft unit. Call (844) 797-5026 for a free estimate.

Call (844) 797-5026

How the Work Actually Moves, Stage by Stage

A garage converted into a guest room and home office

We handle a lot of these, and the sequence never surprises us anymore. Here’s what each stage looks like from the homeowner’s side, so you know what you’re deciding and when.

Stage 1: Site review and drawings (week 1 – 2)

We measure the garage, check the slab, and confirm what’s already there: the water heater location, the electrical panel capacity, the garage door header, and whether the driveway slope allows proper drainage away from the new threshold. You decide the layout and where the bathroom lands. That decision drives everything downstream, so it comes first. We submit drawings for permitting on your behalf and pull the permit in your name as the property owner.

Stage 2: Demo and rough-in (weeks 3 – 5)

The garage door comes off and the opening gets framed and closed with a wall or a window wall. The old slab gets a moisture barrier and a finished floor build-up, or we pour a new slab if grade demands it. Plumbers and electricians trench for the bathroom and kitchenette, and this is where the post-tension cable question matters: existing slabs in Enterprise can’t be cut without scanning first. You’ll approve the rough-in locations before the drywall closes over them.

Stage 3: Insulation and mechanical (week 5 – 6)

Builder-grade garages in this market are essentially uninsulated. Every conversion here gets exterior-wall insulation and attic insulation to code, plus a mini-split unit sized for a space that sits in desert sun. Skip this and the unit will cost real money to cool from May through September. You choose the HVAC brand and whether to add a ceiling fan or two.

Stage 4: Finishes and systems (weeks 6 – 12)

Drywall, texture, paint, trim, the bathroom tile and fixtures, the kitchenette if you’re including one. You’ll pick entry door style here (a Therma-Tru or ViewLux exterior door comes up often), flooring, and paint colors. This is the longest stretch and the one where a decision made in week 4 can stall a crew.

Stage 5: Inspections and punch list (weeks 12 – 16)

Final inspections cover electrical, plumbing, and building. We schedule them, we’re on-site for them, and we correct whatever the inspector flags before it becomes your problem. The walkthrough happens after that. Every job is backed by our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

  • Slab on grade vs. floor build-up. A new pour costs more and adds roughly two weeks, but solves any grading or moisture issue. A build-up over the existing slab is faster and cheaper, and works when the concrete is sound and drains properly.
  • Full bathroom vs. half bath. A full bath adds roughly $6,000 – $14,000 to the job. A half bath is often enough for a rental unit and keeps the plumbing run shorter.
  • Kitchenette perimeter vs. full kitchen. Sink, countertop, and cabinet base runs around $3,000 – $8,000 for a basic setup. A full range and venting add cost and code requirements.
  • Mini-split vs. extension of the house system. Mini-splits are simpler, quieter on retrofit, and the usual choice. Extending the central system is possible if the panel and ducting allow, and costs more but ties into one thermostat.
  • Exterior door and window grade. A basic steel entry door vs. a Therma-Tru fiberglass or ViewLux unit changes both cost and how the unit reads from the driveway. Fencing around the old driveway apron matters too, and that’s where homeowners often pair the job with a matching enclosure using a Barrette or Master Halco system.

What a Garage Conversion ADU Costs in Enterprise, NV

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for a garage conversion ADU in Enterprise, with most projects landing in the $55,000 – $90,000 band for a 400 – 500 sq ft unit with a full bath and kitchenette.

Line item Typical range
Permit fees and drawing review $1,500 – $5,000
Demo, framing, and closing the garage opening $6,000 – $14,000
Slab or floor build-up and moisture barrier $3,000 – $12,000
Insulation and mini-split HVAC $5,000 – $11,000
Bathroom (full or half) $6,000 – $14,000
Kitchenette $3,000 – $8,000
Electrical, plumbing, and panel capacity work $4,000 – $12,000
Drywall, texture, paint, flooring, trim $8,000 – $18,000
Exterior door, windows, and apron fencing $2,000 – $8,000

Five variables push a job toward either end. Slab condition and grade matter most, since an uneven or cracked floor means a new pour. Panel capacity comes next: a 100-amp service with a full panel often needs a swap or subpanel, and that’s a real line item. Plumbing distance matters, since moving the bathroom to the far corner of a garage means more trenching through hard ground. Finish grade, meaning tile vs. LVP and custom cabinetry vs. semi-custom, swings the number. And permit scope matters, because a conversion done with a full scope and finals inspection costs more than a partial one, and a partial one may not pass a resale or lender review.

Your written estimate is line-itemized, and the price you sign is the price you pay. We also offer $1,000 off projects over $10,000 and 0% financing for 18 months. This job usually fits into a bigger plan too, so if the conversion is part of a full Home Additions & ADU in Enterprise plan, we scope it together. More on how we run these projects is on our Home Additions & ADU service page.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Enterprise Homes Specifically Do to This Job

Enterprise is one of the fastest-built-out corners of the Las Vegas Valley, which means the garages we convert here are almost entirely recent tract and master-planned construction: wood-frame, stucco-clad homes on post-tensioned slabs, mostly built between the 1990s and the 2020s. There’s no old housing stock to work around, but there is a specific set of conditions. Caliche is the local excavation nightmare in Enterprise, and a bathroom trench in 89139 can stall for a day when the crew hits cemented desert hardpan just below grade. That’s why we scan the slab before any trenching: post-tension cables run through it, and cutting one is a repair nobody wants on their bill. Summer work gets scheduled early. Concrete pours and stucco patching happen before triple-digit heat sets in, or they fail. When we’re converting a garage for a homeowner off the 215 corridor, whether the driveway apron needs to come out is a real question, and it’s often solved by pairing the job with Asphalt Driveways & Resurfacing in Enterprise or Concrete Driveways & Concrete Work in Enterprise. HOA rules on accessory units and visible equipment vary by subdivision, so we check yours before drawings go out. We serve homeowners across Enterprise.

Serving Enterprise, NV – Our Local Coverage Area

We serve Enterprise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Enterprise

A new stained cedar privacy fence

Ready for a Real Number on Your Enterprise Garage Conversion?

Call (844) 797-5026 to schedule a free on-site estimate for your garage conversion ADU in Enterprise. We’ll look at the slab, the panel, and the garage opening, then put together a line-itemized quote with the permit scope included. Calls are answered by a live person around the clock, and the estimate costs you nothing.

Written by the team at Groundwork Construction Co.

Why Enterprise Chooses Groundwork Construction Co. of North Las Vegas

We set the standard for garage conversion ADU in Enterprise.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Enterprise

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Enterprise Customers Say

Trusted by homeowners across Enterprise and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Enterprise

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Enterprise?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Enterprise.

(844) 797-5026

Request a Free Estimate in Enterprise

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch